null
close
close
click to zoom in
  • Guaranteed Fitment

    Always the correct parts.

  • In-House Experts

    We know automotive.

  • Questions?

    Give us a call.

  • Fast Delivery

    Get your parts fast.

XDP Remanufactured 7.3L AE Fuel Injector XD475 For 1999.5-2003 Ford 7.3L Powerstroke (8 Long Lead)

×

Wait! If you're going to search Google for a better price - give us a shot first. Call us at 410.620.3020 and lets see if we can get you a better deal on this product.

No reviews yet Write a Review
$159.95
SKU:
XD475
Availability:
OE Parts
Weight:
4.00 LBS
products.out_stock

XDP Remanufactured 7.3L AE Fuel Injector XD475 For 1999.5-2003 Ford 7.3L Powerstroke (8 Long Lead)

$159.95

The XDP Remanufactured 7.3L AE Fuel Injector XD475 will replace the damaged #8 Long Lead injector in your 1999.5-2003 Ford 7.3L Powerstroke. With years of manufacturing experience and over 30 million diesel fuel injectors produced to date, you can be sure you are getting a quality product.

By surpassing the manufacturers' current design specifications, these injectors have less than 0.2 percent warranty rate. Every injector is comprehensively tested for nozzle flow and needle lift as well as opening operation and leakage.

Additional tests include shot-to-shot flow meters, poppet seat leakage test, and injection timing measurements for best-in-class testing. Quality and Testing Advanced end-of-line testing, delivery, leakage and opening characteristics.

Precision remanufacturing process ensures highest quality, reliability and performance. Opening clearances are set to strict specifications; validated with engine and vehicle testing and compared to OE product.

Features:

  • Stock HP and Flow Rating
  • Best In Class End-Of-Line Testing Nozzles
  • Tested For Flow, Leakage and Needle Lift
  • In-Line Error Proofing Incorporated In Assembly Process
Fast Shipping
Wide Selection of Parts
Secure Shopping
No Hassle Ordering